AQCAN:Grand Canyon pipeline repairs completed; overnight lodging set to resume

2025-04-28 22:59:58source:Greenledgerscategory:reviews

GRAND CANYON NATIONAL PARK,AQCAN Ariz. (AP) — Pipeline repairs at Grand Canyon National Park are holding and officials plan to lift the suspension of overnight lodging on the South Rim on Thursday, a week after hotels had to begin turning away visitors during one of the park’s busiest times of the year.

Four significant breaks in the 12.5 mile-long (20 kilometer-long) Transcanyon Waterline had caused the famous tourist destination to shut down overnight hotel stays beginning on Aug. 29.

Park spokesperson Joell Baird said Tuesday that the pipeline was successfully repaired late last week and no new breaks have occurred following re-pressurization and regular water flow.

She said the water storage tanks were at 13 ½ feet (4.1 meters) and should be at 15 feet (4.6 meters) by Thursday so the park can return to routine water conservation practices.

Visitors weren’t able to stay overnight at the El Tovar Hotel, Bright Angel Lodge, Phantom Ranch, Maswik Lodge and other hotels due to last week’s water restrictions.

Officials said the park has faced challenges with its water supply since July 8.

Baird said she didn’t know the cost of the pipeline repair or how much the park may have lost in overnight reservations during the Labor Day holiday weekend.

RELATED COVERAGE Indonesia sentences Australian man to 6-month rehabilitation over drug possession in BaliProsecutors seek 8-month rehabilitation for Australian man charged with drug possession in Bali

The Transcanyon Waterline was built in the 1960s and supplies potable water for facilities on the South Rim and inner canyon.

Park officials said the pipeline has exceeded its expected lifespan and there have been more than 85 major breaks since 2010 that disrupted water delivery.

The pipeline failure came amid a $208 million rehabilitation project of the waterline by the National Park Service.

Upgrades to the associated water delivery system are expected to be completed in 2027.

The park wants to meet water supply needs for 6 million annual visitors and its 2,500 year-round residents.

More:reviews

Recommend

As Trump Enters Office, a Ripe Oil and Gas Target Appears: An Alabama National Forest

CONECUH COUNTY, Ala.—At the confluence of the Yellow River and Pond Creek in Alabama’s Conecuh Natio

Colombian congressional panel sets probe into president over alleged campaign finance misdeeds

BOGOTA.Colombia (AP) — A Colombian congressional committee on Wednesday ordered a preliminary invest

Senegal’s opposition leader could run for president after a court overturns a ruling barring his bid

DAKAR, Senegal (AP) — Senegal’s opposition leader Ousmane Sonko was ordered to be reinstated on the